REALIZATION OF PREFAB OFFICE TUCC CPT
-Inside Singara camp in IT-NCC LAND-ERBIL
Details:
This project aims at the creation of fixed structures 1 main buildings that consist of 4 big offices, by sandwich panel and steel structure system double roofing.
With all electrical and LAN system for all offices
Total time for completed this project 12 days
Total area 120 m2
Started 26-10-2017 till 06-11-2017